This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

Lighting design helps cut environmental impact

29 January 2010

A lighting upgrade project, designed by Chalmor, is helping Everards Brewery reduce its carbon footprint and save about £15,000 per annum on lighting costs at its Leicester facility

The project involved replacing existing lighting and introducing lighting controls to minimise energy wastage, taking account of activities within the building to provide the most cost-effective solution.

Established in 1849, Everards has a strong commitment to combining traditional values and practices with innovation and modern technology, and has embarked on a range of measures to minimise environmental impact.

"Upgrading the lighting was one of a number of energy-saving initiatives we have implemented recently. It has brought significant additional benefits in terms of health and safety and improving the working environment for our workforce, as well as facilitating more accurate picking and reducing maintenance costs," explained Everards’ engineering & compliance manager Steve Brassington.

The project encompassed a large warehouse divided into two areas, a draught beer cellar a loading dock and a garage area. The warehouse and cellar areas were formerly lit by 250W high pressure sodium (SON) light fittings, while the loading dock and garage were using elderly T12 fluorescent lighting.

In warehouse and cellar areas Chalmor’s Brilliance 3 x 54W T5 fluorescent fittings have been installed on a point-for-point basis, while in the garage multi-wattage Brilliance fittings have been used, each fitted with 2 x 28W and 1 x 54W lamps. In the loading dock the Chalmor design has used Resilience 2 x 35W IP65 T5 fittings.

The Resilience fittings in the loading dock are zoned into three rows, each controlled separately through an AutoLux 6-channel lighting controller. This enables the lighting to be switched off row by row, in relation to the penetration of natural daylight into the space, with the row closest to the outside being switched off first. In addition, the AutoLux controller also provides timer control to ensure lighting is not on when not needed.

Chalmor also analysed the shift patterns in the various spaces and determined that additional lighting control would not offer significant energy savings over and above those achieved by the more efficient lighting.

In addition to reducing its energy consumption and creating a brighter and more pleasant working environment, Everards will benefit from lower maintenance requirements as re-lamping cycles have been extended from two years to six years. This will also reduce the cost of lamp disposal in compliance with the WEEE Directive over the life of the lighting system.

"We selected Chalmor because of the quality of their products and the guarantees they offer. And we enjoyed excellent support throughout the project," Steve Brassington concluded.


Contact Details and Archive...

Print this page | E-mail this page

RELATED CONTENT...


Article image GlassGuard expands with new appointments

As part of GlassGuard’s continued success and expansion, three new members of staff have joined the fragment retention lamp specialistsFull Story...

MOST VIEWED...


Article image Spray and save on the glazing process

Food glazes are widely used in the bakery sector to improve the look and taste of baked products. Traditionally, this coating process has resulted in substantial waste. Technology advances mean that this is no longer the case. Full Story...

Article image Your flexible friend in the food factory

Suzanne Gill finds out where thermal imaging technology can help around the factory. Full Story...

A dry-ageing process improvement

What role does refrigeration play in the supply chain?

Self diagnostics: an enabler for predictive maintenance

http://www.appetite4eng.co.uk